Often yes for certain preparatory tasks and prefabrication, with installation completed during planned shutdown periods. The ability to keep the lift running depends on safety, access, and whether any door or control interfaces are being disturbed.
Knowledgebase
First published:
Often yes for certain preparatory tasks and prefabrication, with installation completed during planned shutdown periods. The ability to keep the lift running depends on safety, access, and whether any door or control interfaces are being disturbed.