Timescales vary based on design, lead times, and the amount of builders works required. Downtime includes the removal period, installation,…
Replacement is often best when the lift is end of life, the system is obsolete, major components are failing, compliance…
It typically includes surveys and scoping, performance and interface design, specification and tender, tender analysis and appointment support, programme and…
A replacement pack usually includes scope and performance requirements, design and interface requirements, builders works and M&E interfaces, standards, programme…
By aligning scope through the pricing schedule, checking compliance to specification, reviewing exclusions, clarifying provisional sums, comparing programme and logistics,…
Use clear shutdown planning, phased replacement in multi lift buildings, temporary access arrangements if needed, out of hours work for…
Key choices include rated speed and capacity, car size and door arrangements, group control strategy, destination control where appropriate, drive…
Expect commissioning, functional and safety testing, door operation and safety edge tests, levelling and ride quality checks, alarm and communication…
You should receive O&M manuals, a logbook, warranties, as built information, test and commissioning records, training and handover details, and…
Refurbishment focuses on the lift car environment and user facing elements, such as finishes, lighting, fixtures, and aesthetics. Modernisation focuses…